Our Successful Projects Across South Africa
Belair Mall, Fourways - Fight Club
Commercial Renovation for Fight Club: Belair Shopping Centre, North Riding
Environmental Pro Construction (EPC) successfully executed a comprehensive commercial renovation at Belair Shopping Centre, transforming the former Work Central office into a purpose built space for Fight Club. The project required precision and adaptability to meet the client’s unique requirements while adhering to stringent industry standards.
Our scope of work included the removal of all existing brickwork, partitioning, aluminum frames, and ceilings to create a blank canvas. The floor was meticulously screeded to achieve a level finish, and a new wall was constructed with integrated soundproof panels to minimize noise transfer to the adjacent conference room. Plumbing was sealed, and electrical outlets were strategically prepared for streamlined future connections.
To enhance safety and functionality, we installed a compliant fire sprinkler system, reconnected the air-conditioning system, and implemented a suspended ceiling with precise grid work. The space was primed and painted to a high standard, and a contemporary aluminum double door was installed to complete the project.
This renovation reflects EPC's expertise in delivering high quality commercial solutions, combining efficiency, attention to detail, and a commitment to exceeding client expectations.
Fourways Golf Estate, Selbourne - PR Works
Environmental Pro Construction (EPC) successfully delivered a comprehensive commercial remodeling project for PR Works at Fourways Gardens Estate, creating a modern, functional, and professional workspace tailored to the client’s needs.
The project began with the careful removal of outdated carpeting, followed by meticulous floor preparation to ensure a flawless foundation. We installed premium Belgotex carpeting, renowned for its durability and aesthetic appeal, to enhance the overall ambiance.
Concurrently, a skilled team worked on constructing and finishing drywall frames and partitioning. These were expertly skimmed for a seamless finish, painted with precision, and complemented with skirting to achieve a clean and refined appearance. As part of the transformation, high quality wallpaper was applied strategically to add character and sophistication to the space.
To ensure a cohesive and polished interior, all damaged suspended ceiling boards were replaced, restoring the ceiling’s uniformity and enhancing the workspace's overall appeal.
This project highlights EPC’s dedication to excellence in commercial remodeling, combining technical expertise with an unwavering commitment to quality and client satisfaction.
Fourways Golf Estate, Selbourne
Case Study: Comprehensive Commercial Painting and Restoration at Selbourne Building, Fourways Gardens Estate
Challenge
The Selbourne Building at Fourways Golf Estate required extensive restoration and painting to address significant wear and tear. The exterior staircases and metal railings exhibited heavy rust, while the wooden beams showed signs of weathering. Numerous cracks in the plaster around the brickwork, both internally and externally, further compromised the building’s aesthetics and structural integrity.
Solution
Environmental Pro Construction (EPC) executed a meticulous restoration and painting project that revitalized the building while ensuring durability and visual appeal.
The process included:
Metalwork Restoration: All exterior staircases and railings were sanded down to remove rust and old coatings. Heavily rusted sections received a specialized rust inhibitor treatment, followed by priming and painting to achieve a smooth and protected finish.
Woodwork Preparation: Exterior wooden beams were carefully sanded, primed, and coated with a high quality varnish to enhance their natural texture and longevity.
Crack Sealing: All interior and exterior surface cracks were thoroughly sealed to restore the plaster’s structural integrity and create a smooth base for painting.
Painting: The building was painted both internally and externally using premium-grade paints, ensuring a flawless finish with enhanced resistance to the elements.
Outcome
The Selbourne Building now boasts a refreshed appearance with restored functionality. The metal staircases and railings are fully protected against rust, the wooden beams exude a polished and enduring finish, and the sealed cracks ensure a seamless and durable painted surface. This transformation not only improved the building’s aesthetic appeal but also extended its lifespan, earning high praise from the property management team and tenants.
This project underscores EPC’s expertise in delivering comprehensive painting and restoration solutions for commercial properties.
Scottburgh Mall, Amanzimtoti, Kwazulu - Natal
Case Study: Roof Slab Waterproofing at Scottburgh Mall
Challenge
Scottburgh Mall in Amanzimtoti, KZN, faced persistent water leaks from its roof slab, exacerbated by the challenging coastal conditions. The combination of high humidity, salt laden air, and heavy rainfall contributed to the deterioration of the slab, leading to leaks that disrupted operations in a retail store below and posed risks to property and merchandise.
Solution
Environmental Pro Construction (EPC) carried out a meticulous inspection of the roof slab, identifying three compromised areas that required immediate attention. To address the issue, a specialized waterproofing system was applied, followed by the installation of a durable bitumen torch-on layer for enhanced protection. This approach ensured the slab was well equipped to handle the harsh coastal environment and prevent future water ingress.
Outcome
The waterproofing measures successfully stopped the leaks, restoring the retail space below to full functionality. The bitumen torch-on system provided a robust, long lasting solution that could withstand the unique challenges of a coastal climate.
This case study highlights EPC’s expertise in adapting solutions to meet the demands of complex environments, ensuring long-term protection and client satisfaction.
Harbor Bay Mall, Simons Town, Cape Town
Case Study: Roof Slab Waterproofing and Rectification at Harbor Bay Mall, Simon's Town, Cape Town
Challenge
The roof slab of Harbor Bay Mall in Simon's Town exhibited significant water ingress into retail stores below, caused by improper leveling and inadequate drainage access. These issues threatened the structural integrity of the building and disrupted store operations, necessitating immediate and expert intervention.
Solution
Environmental Pro Construction (EPC) conducted a thorough inspection and assessment of the roof slab using specialized techniques to pinpoint compromised areas. Our team implemented a comprehensive waterproofing solution to restore the slab’s integrity while maintaining confidentiality regarding our proprietary methods.
Key steps included:
Rectification of Levels: We re-screeded the roof slab to ensure an adequate fall, enabling efficient water channeling to drainage points and mitigating pooling.
Waterproofing: Specialized waterproofing systems were applied to seal all compromised areas, providing a durable and water resistant barrier.
Surface Preparation: The slab was floated to a smooth finish, preparing it for potential tiling based on the client’s future preferences.
Outcome
The rectified roof slab now ensures proper drainage, eliminating leaks into the stores below and safeguarding the mall’s infrastructure. The smooth, finished surface offers flexibility for future tiling, enhancing the slab's versatility. EPC’s swift and effective execution minimized disruption to the mall’s operations, earning commendation from the client for our professionalism and expertise.
This project reinforces EPC’s reputation for delivering tailored waterproofing and rectification solutions that address complex challenges in commercial properties.
24 Wellington Road, Parktown
Case Study: Comprehensive Painting, Carpeting, and Renovation at 24 Wellington Road, Parktown
Challenge
The commercial property at 24 Wellington Road required a multi-faceted interior renovation to address aging infrastructure and enhance functionality. The project involved painting, carpeting, wooden flooring, plumbing corrections, and minor structural repairs, with the goal of modernizing the space for improved tenant satisfaction.
Solution
Environmental Pro Construction (EPC) undertook an extensive restoration process, ensuring a seamless transformation across three floors.
Interior Painting: Each floor was carefully prepared and painted using premium-grade paints to create a fresh, professional appearance.
Carpeting Installation: Old carpeting was removed, and floors were meticulously prepared. New Belgotex carpeting, known for its durability and style, was installed throughout all floors, providing a polished and cohesive look.
Wooden Flooring and Plumbing Repairs: Sections of wooden flooring were repaired and refinished, while compromised plumbing points were corrected to ensure full functionality.
Ceiling Repairs: Damaged suspended ceiling boards were replaced where necessary, restoring the uniformity and appeal of the interior.
Custom Joinery: Old, damaged cupboards were removed, and new cupboards were custom-built and installed to meet modern design and storage needs.
Roof Leak Repairs: Roof leaks were identified and rectified to protect the building from further water damage.
Outcome
The comprehensive renovation resulted in a revitalized commercial space that is both functional and aesthetically appealing. The high-quality finishes, durable materials, and attention to detail significantly enhanced the property’s value and tenant experience. EPC’s commitment to excellence ensured the project was completed on schedule and to the highest standards, earning the trust and satisfaction of the client.
This project highlights EPC’s ability to deliver tailored commercial renovation solutions that combine technical expertise with superior craftsmanship.
Lonehill Shopping Centre - Roof Repairs
Case Study: Roof Repair at Lonehill Shopping Centre
Challenge
A busy commercial property in Lonehill, namely Lonehill Shopping Centre, faced persistent disruptions caused by leaks from an improperly installed IBR roof. The rainy season worsened the situation, with water ingress impacting tenant operations and threatening sensitive equipment. The roof had a history of temporary fixes, with poor drainage and insufficient insulation adding to escalating maintenance costs.
Solution
Environmental Pro Construction (EPC) conducted a comprehensive assessment, uncovering improper installation techniques, inadequate flashing, and blocked drainage systems. To address these issues without exceeding the client’s budget, EPC developed a targeted repair plan:
Carefully removing existing IBR sheets to locate and fix leaks.
Reinstalling the IBR sheets with proper alignment and secure fastening.
Installing new flashing in critical areas to prevent future leaks.
Clearing and optimizing drainage systems for efficient water flow.
Enhancing insulation in accessible areas to improve energy efficiency.
Outcome
The repaired roof now effectively withstands Lonehill’s rainy seasons, eliminating water ingress and protecting tenant operations. Optimized drainage prevents pooling, and improved insulation contributes to lower energy costs. This was a cost effective solution, which extended the roof's lifespan without requiring a full replacement. Certain areas of the roof will have to be replaced at a later stage due to improper installation techniques.
Sandhurst Towers, Sandton
Case Study: Roof Slab Rectification at Sandhurst Towers Penthouse, Sandton
Challenge
The uppermost penthouse of Sandhurst Towers, overlooking Fredman Drive, experienced significant water ingress into multiple units below. The issue stemmed from improperly leveled roof areas and unregistered renovations made by the previous owner. Poorly installed and misaligned drainage points exacerbated the problem, causing extensive leaks and structural concerns.
Solution
Environmental Pro Construction (EPC) conducted an in-depth inspection and assessment of the roof slab. Using our specialized and confidential techniques, we identified multiple compromised areas that required immediate rectification.
Key steps included:
Drainage System Rectification: All improperly set drainage points were corrected and reconnected to the main outlets to ensure efficient water flow.
Leveling and Screeding: The roof slab was re-screeded to create an adequate fall, ensuring proper channeling of water to the adjusted drainage points.
Waterproofing: Advanced waterproofing systems were applied to seal all compromised areas. These methods remain proprietary and were executed with precision to maintain the integrity of the structure.
Outcome
The rectified roof slab now prevents water ingress, ensuring the protection of multiple units beneath the penthouse. The improved drainage system and proper leveling provide a long term solution to previous water management issues. This critical rectification enhanced the building's structural integrity and tenant satisfaction.
EPC’s expertise in addressing complex rectification challenges reinforces our commitment to delivering durable and effective solutions for high-end residential and commercial properties.
Re-roofing, Sandton
Case Study: Roof Replacement at Hyde Park Multi-Housing Complex
Challenge
The Hyde Park Multi-Housing Complex experienced widespread leaks affecting multiple units. The issues stemmed from a previous roof replacement where the original slate tiles were replaced with Harvey metal tiles. While lightweight, these tiles were easily dented, prone to damage, and improperly installed. The incorrect layout and compromised underlying woodwork further exacerbated the problem, necessitating a complete roof overhaul.
Solution
Environmental Pro Construction (EPC) conducted a comprehensive assessment of the roof structure, determining that it was sound enough to accommodate more durable roofing materials. After consulting with the client, we recommended replacing the Harvey metal tiles with Double Roman concrete tiles for enhanced durability and aesthetic appeal.
Key steps in the project included:
Removal of Existing Roof: The Harvey metal tiles and damaged underlying woodwork were carefully stripped and removed.
Installation of Underlay Membrane: A high-quality underlay membrane was laid across the entire roof surface to provide an additional layer of water resistance.
Reconstruction of Wooden Grid: A new wooden grid structure was constructed to accommodate the Double Roman concrete tiles, ensuring proper alignment and stability.
Tile Installation: The new Double Roman concrete tiles were meticulously installed, with special attention given to sealing critical areas such as chimneys.
Flashing and Finishing: Cover and ridge flashing were set in place to ensure a weather tight finish and prevent future leaks.
Outcome
The newly installed Double Roman concrete tile roof significantly improved the durability and functionality of the housing complex. The robust materials and precise installation eliminated leaks, enhanced the overall aesthetic, and increased the property’s value.
This project showcases EPC’s ability to deliver tailored roofing solutions that address structural challenges while ensuring long lasting performance and client satisfaction
Sandhurst Towers, Sandton
Case Study: Structural Restoration at Sandhurst Towers, Sandton
Challenge
Sandhurst Towers experienced significant structural damage due to water infiltration through compromised points in the building's facade and from an upper level apartment. The issue manifested in extensive damage to structural slabs, plasterwork, and brickwork, requiring immediate professional intervention due to the building's considerable height and the complexity of the affected areas.
Solution
Environmental Pro Construction (EPC) conducted a thorough assessment and implemented a comprehensive restoration strategy that addressed both the source and consequences of water damage.
Key steps in the project included:
Scaffolding Setup: Installation of specialized scaffolding systems to safely access affected areas in the multi-story building.
Damage Assessment: Detailed inspection of all compromised areas to determine the extent of structural and cosmetic damage.
Plaster Removal: Careful removal of damaged plaster from both interior and exterior surfaces to expose underlying issues.
Waterproofing Application: Implementation of proprietary waterproofing techniques and materials to seal compromised brickwork.
Specialized Plastering: Application of custom formulated plaster mix designed for enhanced water resistance and durability.
Quality Control: Comprehensive testing to ensure the effectiveness of waterproofing measures.
Outcome
The restoration project successfully resolved the water infiltration issues and restored the structural integrity of the affected areas. EPC's specialized waterproofing solutions and expert application techniques ensured long term protection against future water damage, while the carefully formulated plaster mix provided both aesthetic appeal and enhanced durability.
This project demonstrates EPC's expertise in high-rise building restoration and our ability to deliver effective solutions for complex structural challenges.
Safari Gardens, Rustenburg
Case Study: Multi-Level Waterproofing Solution in Rustenburg Estate
Challenge
A luxury Rustenburg property experienced significant water damage affecting multiple levels. The primary issues stemmed from an improperly leveled roof slab causing water infiltration into the room below, while the ground floor decking slab leaked into the wine cellar. Poor drainage design and inadequate water channeling resulted in persistent leaks during rainfall, threatening valuable wine storage and interior finishes.
Solution
Environmental Pro Construction (EPC) implemented a comprehensive waterproofing strategy addressing both structural and drainage issues across multiple levels.
Key steps in the project included:
Diagnostic Assessment: Thorough inspection to identify all compromised areas and drainage inefficiencies.
Waterproofing Application: Implementation of specialized waterproofing systems to seal identified problem areas.
Drainage Optimization: Rectification of drainage points and water channeling systems.
Surface Preparation: Professional floating of the decking slab to achieve optimal surface for tiling.
Tile Installation: Expert installation of tiles over the prepared decking surface.
Roof Slab Enhancement: Application of precision-engineered screed to create adequate pitch for efficient water runoff.
UV Protection: Application of specialized UV-resistant coating to extend waterproofing longevity.
Outcome
The multi-level waterproofing solution successfully resolved all water infiltration issues, protecting both the living spaces and wine cellar from future damage. The improved drainage system and UV-protected surfaces ensure long-term performance and durability, while the professional tiling installation enhanced both functionality and aesthetics.
This project showcases EPC's expertise in complex waterproofing solutions and our ability to deliver comprehensive protection for high-value residential properties.
Eagle Canyon Golf Estate, Honeydew
Case Study: Rising Damp Treatment at Eagle Canyon Golf Estate
Challenge
A property in Eagle Canyon Golf Estate, Honeydew, faced severe rising and penetrating damp issues threatening the structural integrity of the building. Left untreated, the moisture problems had created ideal conditions for toxic mold growth, posing not only structural risks but also serious health hazards to the occupants. Rising damp had compromised wall integrity from foundation level upward, demanding immediate professional intervention.
Solution
Environmental Pro Construction (EPC) developed and implemented a comprehensive moisture management strategy, addressing both the source and effects of the rising damp.
Key steps in the project included:
Foundation Assessment: Detailed inspection to identify primary moisture entry points and damage extent.
Excavation Work: Professional excavation to foundation level to access affected areas.
Drainage Implementation: Installation of specialized drainage solutions refined through years of industry experience.
Waterproofing Application: Implementation of proprietary waterproofing systems at foundation level.
Wall Restoration: Application of specialized plaster mix designed for enhanced moisture resistance.
Quality Assurance: Comprehensive testing to verify the effectiveness of damp-proofing measures.
Outcome
The intervention successfully halted all rising damp issues and prevented further moisture ingress. EPC's specialized drainage solutions and expert application techniques ensured long term protection against future damp problems, while the carefully formulated plaster mix provided both aesthetic appeal and enhanced moisture resistance.
This project demonstrates EPC's expertise in complex damp-proofing solutions and our commitment to protecting high value residential properties from moisture related damage.
Wildtuinpark, Krugersdorp
Case Study: Custom Home Construction at Wildtuin Park Estate, Krugersdorp
Challenge
The client commissioned Environmental Pro Construction (EPC) to construct a single-story residential property from ground up at the prestigious Wildtuin Park Estate in Krugersdorp. The project required full compliance with NHBRC (National Home Builders Registration Council) regulations and comprehensive insurance coverage to ensure both legal compliance and client protection.
Solution
EPC delivered a complete construction project adhering to all South African building regulations and quality standards.
Key project phases included:
Site Preparation: Professional site clearing and excavation to establish proper foundation levels.
Foundation Work: Construction of engineered foundations meeting NHBRC specifications.
Structural Elements: Installation of load bearing walls, roof trusses, and structural components.
Services Installation: Complete electrical, plumbing, and air-conditioning systems integration.
Interior & Exterior Finishing: High quality plastering, painting, and final detailing.
Regulatory Compliance:
NHBRC enrollment ensuring 5 year structural warranty protection
Comprehensive construction insurance coverage
Municipal building plan approval and compliance
Electrical Certificate of Compliance (CoC)
Plumbing Certificate of Compliance
Gas Certificate (where applicable)
Roof Certificate
Glazing Certificate
Occupation Certificate from local authority
Outcome
The project delivered a fully compliant, high quality residence with all necessary certifications and warranties in place. The comprehensive documentation and adherence to NHBRC requirements provided the client with complete peace of mind, knowing their investment was protected under South African construction law.
This project showcases EPC's commitment to legal compliance and quality assurance in residential construction, demonstrating our ability to deliver turnkey solutions that meet all regulatory requirements while exceeding client expectations.
Heritage Manor, Krugersdorp
Case Study: Heritage Manor Estate Double Story Construction
Challenge
A client at Heritage Manor Estate required construction of a double story residence up to plaster and roof level, with finishings planned for a later phase due to budget considerations. The project demanded full NHBRC compliance while accommodating a staged construction approach.
Solution
Environmental Pro Construction (EPC) executed a strategic construction plan focusing on core structural elements while ensuring future completion flexibility.
Key project phases:
Site Preparation: Professional excavation and foundation preparation.
Structural Work:
Engineered foundations
Ground and first floor construction
Wall systems installation
Roof structure and covering
Complete interior and exterior plastering
Regulatory Compliance:
Full NHBRC enrollment and certification
Construction insurance coverage
Municipal approved plans
Stage completion certificates
Structural engineering certification
Outcome
The project delivered a structurally complete double story shell meeting all NHBRC standards and building regulations. This phased approach successfully balanced budget constraints with quality construction, ensuring a solid foundation for future finishing works.
This project showcases EPC's expertise in delivering flexible construction solutions while maintaining strict regulatory compliance and structural integrity.
Blairgowrie, Johannesburg
Case Study: Complex Roof Restoration in Blairgowrie, Johannesburg
Challenge
A residential property in Blairgowrie experienced severe roof leaks affecting the lounge and dining areas. Initial inspection revealed an unexpected corrugated roof system beneath concrete tiles, with extensive damage to the wooden support structure and incorrectly positioned valleys. This hidden dual roof system complicated the restoration process and had contributed to significant water damage.
Solution
Environmental Pro Construction (EPC) developed a comprehensive roof rehabilitation strategy addressing both structural issues and water management.
Key project phases:
System Removal: Safe removal of concrete tiles and underlying corrugated roofing.
Structural Renovation:
Complete replacement of compromised wooden grid structure
Installation of new timber support system
Engineering of proper roof pitch for optimal drainage
Waterproofing: Installation of high quality under tile membrane.
Tile Reinstallation:
Professional repositioning of existing concrete tiles
Correct valley and ridge construction
Proper sealing of all junction points
Outcome
The roof restoration successfully resolved all leak issues through proper structural rehabilitation and correct installation techniques. The improved pitch and properly constructed valleys ensure efficient water management, while the new wooden grid structure provides long term stability and support.
This project demonstrates EPC's expertise in complex roof restoration and ability to resolve unexpected structural challenges while maintaining cost efficiency through materials reuse.
Fourways Gardens, Fourways
Case Study: Balcony Waterproofing Solution in Rustenburg
Challenge
A premium property in Fourways Gardens Estate faced serious water infiltration issues from a large balcony area, affecting both the patio below and adjacent main bedroom. The problems stemmed from incorrect surface levels, inadequate drainage, and poor sealing around aluminum installations. Water penetration through compromised brickwork had caused extensive interior damage.
Solution
Environmental Pro Construction (EPC) implemented a comprehensive waterproofing and restoration strategy addressing all structural and drainage issues.
Key project phases:
Surface Preparation:
Complete removal of existing tiles and screed
Exposure of original concrete surface
Thorough cleaning and preparation
Waterproofing:
Application of specialized waterproofing systems
Implementation of proper drainage solutions
Professional sealing around aluminum fixtures
Surface Finishing:
Installation of correctly pitched screed
Professional tiling installation
Quality control testing
Outcome
The project successfully resolved all water infiltration issues, protecting both the patio below and main bedroom from further damage. The improved drainage system and proper surface levels ensure efficient water management, while the professional tiling installation enhanced both functionality and aesthetics.
This project showcases EPC's expertise in complex waterproofing solutions and our ability to address multiple water related challenges in high end residential properties.
Brackenhurst, Ekurhuleni
Case Study: Boundary Wall Water Damage Rectification - Brackenhurst
Challenge
A residential property in Brackenhurst faced persistent water ingress issues along a boundary wall. The wall’s plaster was saturated, leading to extensive damage and compromising its structural integrity. With no proper drainage or slope design at the top end of the wall, water continuously pooled, exacerbating the problem.
Solution
Environmental Pro Construction (EPC) was called to inspect and assess the full extent of the damage. Our team executed a comprehensive rectification plan:
Removed all saturated plaster to expose the underlying brickwork, allowing for a thorough inspection.
Treated the brickwork with advanced waterproofing techniques to ensure long term protection against future water ingress.
Replastered the boundary wall using high strength materials, with particular attention to the slope design at the top edge to channel water runoff effectively.
Installed drainage holes at the base of the wall to facilitate proper water runoff, preventing future water buildup.
Outcome
The rectified boundary wall now boasts enhanced durability and resistance to water ingress. The improved slope and drainage system ensure proper water management, safeguarding the structure from further damage. The homeowner expressed satisfaction with the swift and efficient execution of the project, which restored the wall’s integrity and aesthetic appeal.
This project highlights EPC’s expertise in addressing water damage with innovative waterproofing solutions tailored to the unique challenges of each site.